TL;DR: The deeper, undiscussed bottleneck to U.S. AI data centers and industrialism is the U.S. utility business model. Investor-owned utilities serve ~75% of Americans and earn a ~10% guaranteed profit margin on new equipment spending—a 40%–60% markup above the ~6% regulated return they are legally supposed to earn given their low-risk monopoly status—incentivizing them to build slow, expensive, custom grid gear under roughly a dozen federal laws from the past century that keep the grid fractured.
The real bottleneck to scaling the U.S. grid is that private, investor-owned utilities supply electricity to roughly 75% of Americans and they're completely slow to make any relevant upgrades.
These types of utilities (IOU = Investor Owned Utility) make money by building new grid equipment—poles, wires, and substations—and passing the bill on to you.



They pay for these upgrades using a mix of loans and shareholder cash, then go to their state regulator (like the PUCT in Texas) to raise your electric bill—not just to pay off the equipment and loans, but to give their shareholders a guaranteed profit on top.
Here’s where the racket comes in.
Because these utilities are low-risk monopolies with captive customers, the law says their guaranteed shareholder profit is supposed to match what a safe investment earns on Wall Street—around 6% to 6.7%. Instead, as former Sempra chief economist Mark Ellis has documented, state regulators routinely rubber-stamp a profit margin closer to 10% (~9.6%–9.7%). That is a 40% to 60% profit markup baked straight into your bill, costing Americans $50B–$60B a year in excess charges.

Utilities lock in that rubber stamp using a four-part playbook.... 
  • Rigging the Math: They hire high-priced Wall Street consultants to flood regulators with flawed formulas that compare safe monopolies to risky companies, dragging the "average" profit estimate up toward 10%.
  • Outgunning Watchdogs: Utilities spend millions of ratepayer dollars on top lawyers and lobbyists, overwhelming small, underfunded state consumer agencies that can't afford to fight every line item.
  • Threatening a "Capital Strike": They warn politicians and regulators that cutting profits below 10% will spook Wall Street, trigger credit downgrades, and starve the local grid of funding.
  • Backroom "Black Box" Deals: They start by asking for a massive rate hike, then privately offer key groups small wins—like cheaper rates for big factories or dropping an unpopular monthly fee—so those groups sign off and leave the ~10% profit rate untouched.
Meanwhile, a century of federal laws—FPA, PUHCA, REA, PURPA, EPAct 1992, EPAct 2005, and IEEPA—pushed three major macro forces onto the U.S. grid:
  • Avoiding Federal Oversight by Staying Disconnected: Crossing state lines triggers federal control, giving regional grids like Texas’s ERCOT a strong incentive to stay electrically isolated to protect local governance—while the rest of the nation accepted federal jurisdiction in exchange for interconnected markets.
  • Balkanization and Needless Customization: Splitting the grid into isolated regions and hundreds of separate utility territories bred fragmented engineering rules, encouraging custom-built, bespoke equipment instead of standardized, mass-produced gear.
  • Encouraging New Spending Over Optimization: By locking in a system that rewards building new physical assets rather than squeezing more efficiency out of existing lines, utilities are incentivized to inflate equipment spending to pump shareholder payouts and stock prices. 
Together, these forces have crippled our ability to build fast—choking supply chains and stalling industrial and data center growth.

To give you an idea of how crazy things are.

It takes 3-5 years to get an interconnectioj nrequeest and load study done.
It takes 2-4 years to order gas turbine blades and transformers.
There are 80k SKUs of transformers on the grid.



I believe the only way to start fixing the US grid is to end the spending-inflation loop by tying utility profits to their true market cost and opening grid expansion to standardized, competitive power rather than bespoke monopoly markups.


Note: I used gemini throughout this blog post to try to summarize my thoughts in infographics - feel free to share them, critique, or otherwise. I've spent my time looking at small and large systems alike across dozens of industries and I take it for granted that my brain has an automatic taxonomy and schema for thinking about it. By creating these infographics - my hope is in helping people who read my blog speed run an understanding of investor owned utilities.

One of the men who taught me a bit about how US grids work is Mark Ellis- he's the former CSO of Sempra energy and a subject matter expert on utility pricing dynamics. Take a look at what he's built where I linked his name.